Forecast BG Job and messages to be Ignored

$
0
0

Dear Experts,

 

The background activity definition for forecast has some 50 odd message numbers that can be checked to set the batch job (TS_BATCH_RUN) to success but the message class /SAPAPO/MA has several scores of messages related to the context of stat forecast that are not in included in this background activity definition (to check). This leads to a situation where the error management in resp. process chains fail and/or the batch job itself ending with errors but still showing as finished.

 

Is there a cleaner solution to this nuisance apart from the random bunch of message specific notes released by SAP on ad-hoc basis ? An example message number is 502, 503, 504.. esp. if I KNOW what messages can be safely excluded from raising the errors.

 

Thanks

BS


Replenishment Lead Time Change Log

$
0
0

Hello Experts

 

While making change to Replenishment Lead time field in the Product Master, the changes are not visible in the change log in transaction /SAPAPO/PROD_CD_READ. Can you please advise?

 

Capture.PNG

 

Thanks in advance.

 

Best Regards,

Parth Soneji

Change pointers in APO

$
0
0


How to create change pointers in APO programaticaly ? As it creates an entry in table /SAPAPO/DMCP in APO. Want to know how can we update this table so that it can be processed using /sapapo/c5 t-code.Kindly help.

590 Error Code in CIF

$
0
0

Getting the Following Error in CIF

Error Code - 590

Different or missing configuration

Message no. /SAPAPO/CIF590

 

Checked the Configuration in both APO and R/3.

Everything is Matching. Still I am getting the Error.

help on the below APO DP issues

$
0
0

Hi All,

 

 

Can you please suggest me how to proceed with the below issues and to correct it.

 

Issue.JPG

 

 

BR,

Ankit Bassi

Message type_X while creating time series object

$
0
0

Hi Experts,

 

I get this error "ABAP PROCESSOR : MESSAGE TYPE X" when I am creating time series object in planning area.

 

I have tried all consistency checks. Checked version 000 is active. When checked this error ST22 it showed me message class "DBMAN" Message no. 257. Later I Checked in SE91 with relative messsage class and no. it give me description as " SQL error : &1"

 

 

 

I am unable to initialize the planning area because I am unable to create time series object.

 

Please help!!!

 

Thanks,

Ankit

Difference between SNP horizon, SNP production horizon and PP/DS horizon

$
0
0

I am new to this world of SCM and confused about SNP horizon, SNP production horizon and PP/DS horizon. May I ask for assistance in garbing the concept using some example flows in business scenarios.

 

Thank you

Path in SPRO

$
0
0

Hi experts,

I need find the path in the transaction SPRO the maintenance the data last selected "Assign User to Planning Book ".

 

 

I attached picture.

 

Captura.JPG

 

 

 

 

Thanks.


To build query related to SNP: Planned Order

$
0
0

Hi,

 

System: SCM 5.0

Scenario: SO received at plant and planning creates PR against SO at plant and accordingly SNP:Planned Order at Vendor location. If SO is cancelled/deleted (manually), sometime only the PR gets cancelled/deleted (automatically during planning run) but corresponding SNP:Planned Orders still remains at vendor location and so the dependent requirements. PR and Planned Orders are pegged to SO so one-to-one relation is maintained.

 

I could not find any reason why system is not deleting Planned Order at vendor location despite SO and PR is deleted at plant location. So I am planning to build query where SNP:Planned Orders are not pegged to any PR or SO.

 

Can anyone help with list of SNP:Planned Order tables so that I can build query around it to identify ghost Planned Orders.

 

Hope I was clear with my query but let me know if any further information is require.

 

Thanks and regards,

Devang

Back dated PReqs created in ECC

$
0
0

Hi Experts,

We have a situation where in the the PReqs in ECC are calculated in

past.

We have an example where by there was a requirement at C079 on 24th

February. There is GR Processing time of 5 days maintained at C079 and

transport duration of 24 minutes. After running deployment, a

Distribution Demand (Confirmed) was created on the source, C061 on 19th

February and a Distribution Receipt (Confirmed) was created on C079 for

24th Feb. This, we believe is as expected.

Now, in ECC we are able to see a PReq at C079 on 24th Feb, but the

corresponding PReq on C061 is showing on 2nd Feb in MD04. We need to

understand that as to why the PReq at C061 has been created in past.

Please note that there is a Planned Delivery Time of 17 days maintained

at C079. We understand that this should not cause any issue, but please

take a note of it.

Please advice. Thank you.

 

Regards,

Rishi

DP Error "You do not have authorization for all the characteristic values selected"

$
0
0

Hello Experts:

I just created a setup for product allocation. I created two CVCs and then trasferred transferred them to the product allocation group. Then I tried to go to interactive demand planning in /sapapo/sdp94 to add some allocation values in . Then I got the error that you can see in the attached document - "You do not have authorization for all the characteristic values selected". I am not able to proceed further.

 

I talked to the security person and they say that I have plenty of acccess. According to them, this access restriction is not coming from authorization. But the error says that I do not have sufficient authorization for all the characteristic values.

 

I have seen other threads on this topic. Some of them are listed below. But I could not find anything that I can implement right away.

 

http://scn.sap.com/thread/3288501

http://scn.sap.com/thread/1289518

http://sap.ittoolbox.com/groups/technical-functional/sap-apo/apo-interacting-planning-book-4426453

 

Let me know if you have any thoughts of how I can proceed from here. Thanks in advance!!

 

Satish Vadlamani

What you need to know about optimizing forecast consumption in SAP APO: View the transcript from a Q&A with one of our SCM 2015 speakers

$
0
0

Managing forecast consumption settings can be a tricky, error-prone activity. We asked SCM 2015 speaker Sean Mawhorter of SCM Connections to host an online Q&A to address users' questions and share tips on optimizing forecasts for more accurate demand and supply planning results. Check out an excerpt fromthis Q&A session and see whether your questions were answered.

 

Sean will be one of the featured speakers at SAPinsider’s SAP SCM 2015 conference in Las Vegas, March 30 – April 1. For more info on the event visit our website at Logistics & SCM, PLM, Manufacturing, and Procurement 2015 and follow us on Twitter @InsiderSCM


Comment from Rohit

We changed the packaging specifications for a couple of SKUs and gave them a new material number. How do we forecast for these new materials using the forecast of the old ones? We have tried life cycle planning, but the demand planners think it is too tedious to maintain all the entires. Is there any other option other than life cycle planning and realignment/copy?

 

Sean Mawhorter: Unfortunately, there are not too many more options to address these requirements (although they are fairly common). One option is to copy the sales history from the old item to the new item, but that can throw off your aggregate sales history. Plus, it’s a manual process.

 

Comment From Pavani

Can we assign a custom category to TLB order STO in APO system, so that we can influence consumption of forecast by this custom category?

 

Sean Mawhorter: It is possible to set this up in the consumption configuration. It is a combination of the requirements planning strategy and ATP categories and assignments.

 

Comment From Anna

Do you have any recommendations on when to use backward vs forward consumption methods and the time frame for the orders to be considered?

 

Sean Mawhorter: This is a great question, but would require a long answer. Short answer is that a combination of the sales order volume/quantities, order drift, and forecast bias should lead to segregation of your materials and/or material-location combinations and backward/forward settings should be established and managed using these groups.

 

Comment From Rangarajan

Can you explain order drift?

 

Sean Mawhorter: Order drift is the propensity for an order to be in a different bucket that its intended forecast. An indicator of this can be where the forecast accuracy for a single bucket (month) is usually much lower than the forecast accuracy of a multi-bucket window (e.g., 3 months). So timing is more the issue than the quantity itself.

 

Comment From Rangarajan

Can we maintain forecast consumption settings in SNP different for each material?

 

Sean Mawhorter: This is standard functionality. The consumption parameters are set in the product master at the product-location level.

 

Comment From Suat

Consumption of different forecasts: If we have more than one forecast line (50 pcs and 100 pcs for example) in SNP relevant for consumption by a sales order of 120 pcs, how we can find a way to consume fully the first one and partly the second one? The reason why we have more than one forecast figure is because we want to add specific characteristics to represent priorities, for example.

 

Sean Mawhorter: Have you investigated the use of extra forecast characteristics for this one (i.e. adding priority as an additional characteristic to the customer to be used in the consumption)?

 

Comment From André

How can we use forecast and safety stocks together to increase the SNP plan quality?

 

Sean Mawhorter: This is an area where many are confused as to what dial to turn when...
Safety stock is really the dial to turn to adjust inaccuracies in the forecast quantity itself, versus consumption settings, which are used to address inaccuracies in the timing of that forecast.
There are many variables that can affect these; the key is knowing which dial to turn when. ;-)

 

Comment From Rangarajan

Can forecast consumption work other than the Active 000 Planning version?

 

Sean Mawhorter: It can, but you need to use the save_multi bapi to create the sales orders in the other version. Sales orders are normally sourced from ECC and only populate version 000 by default.

 

To view the rest of the transcript, click here.

APO DP Planning book cell entry or exit - macro way to validate business rules

$
0
0

Dear All,

 

We have requirement from business that Demand planner will key in forecast in respective KF, when comes out of one cell and go to another cell to enter forecast, we have to validate the cell value with 3 months average and if it is deviated certain percent we need to highlight with different color.

 

Note: Planner do not want to enter/save in between moving between planning book cells.

 

For example: 3 months average is 100. Planner wants to enter forecast in cells continuously for next 12 months without hitting Enter key or save. I want to compare the cell value with average and if its deviated beyond certain level we need to highlight the cell with different color.

 

I know that we have macro events will work when we hit enter key or save or exit or level change.

 

I am not sure this is possible, wanted to know any other way possible.

 

Thanks in advance.

 

Please share your thoughts.

 

Sreeni

Change pointers in APO

$
0
0


How to create change pointers in APO programaticaly ? As it creates an entry in table /SAPAPO/DMCP in APO. Want to know how can we update this table so that it can be processed using /sapapo/c5 t-code.Kindly help.

Changing & deleting the SNP PDS planned order in APO using BAPI

$
0
0


Hi,

 

There is a requirement to consolidate the SNP PDS planned order created from CTM in APO. This is to change one of the SNP PDS planned order by adding the quantities of the other planned order , which is to make it into one & delete the other SNP PDS planned order. Can this be done progrmatically using BAPI?. As we know this cant be changed in RRP3 as the SNP-PDS are uneditable.Please help me on this one. As I need the solution to this ASAP.

 

Is there any BAPI/FM using which SNP PDS planned order can be changed? What is the BAPI for PPDS planned order creation / change?

With thanks & regards,

Naveen

 

Message was edited by: Naveen Srinivasa


Purchase Info Record (CIF Error)

$
0
0

I am trying to CIF Purchase info records to APO.

But the purchase info records are not ciffed to APO.

I am getting below.

 

  Location XXX does not exist

  Procurement relationship not created for 3(Purchase info Record Category) XXXXXXXXXX(Purchasing info record Number) XXXX(Purchasing                   Organisation) XXXX(Location).

 

Kindly help on this,

 

Thanks in advance.

 

Thanks and Best Regards,

Ravi Sagar Chennu

Considering Stock and Capacity in Product Interchangeability for SNP Optimizer

$
0
0

Hello Guys, need your help!


I have a requirement in product interchangeability. I have two grades A and B and have enabled PIC at customer. the scenario is if forecast is at A for certain quantity then the STOCK and then CAPACITY should get utilised for leading grade (A) and then substitution demand should go to next grade.


Now the problem is if I use supersession, only the STOCK is consumed and if I use FFF then system checks the STOCK and then all the costs (if B is cheaper then all the demand goes to B). Is the above requirement achievable through BADi or any standard process?


Scenario 1 - FFF


Capacity for Grade A - 300 MT, Conversion Cost - 1000/MT, STOCK - 50 MT

Capacity for Grade B - 300 MT, Conversion Cost - 500/MT

Forecast for Grade A - 400 MT


what happens is 50 mt of stock for A is consumed first, then 300 mt of B is manufactured (as it is cheaper) and then 50 mt of A is manufactured.


Scenario 2 - Substitution


Capacity for Grade A - 300 MT, Conversion Cost - 1000/MT, STOCK - 50 MT

Capacity for Grade B - 300 MT, Conversion Cost - 500/MT

Forecast for Grade A - 400 MT


50 mt of stock for A is consumed first and then balance production plan goes to B.


Please help me with my requirement.


Thanks.

Message/email setting for CIF queue failure in /sapapo/cq transaction

$
0
0

I have to maintain message/email setting coming out in case of every CIF queue related failure in /sapapo/cq transaction. Please let me know where and using which transaction I can maintain such setting, as I am not able to find such options in /sapapo/cq transaction

CIF error while converting Pur.req to schedule line in /SAPAPO/RRP7

$
0
0

Hello,

 

When I try to convert the pur.req to schedule line via /SAPAPO/RRP7, I get CIF errors which is temporary error.

So everytime i need to reactivate the errors in queue manager (/SAPAPO/CQ).

Anybody know how to solve this situation?

 

Thanks in advance.

 

Best regards,

Suresh V

Automatic Procedure 2 generating negative values

$
0
0

Hi all,

 

We are using Automatic Procedure 2 (Strategy 56) for Forecast generation.

Forecast Profile Settings are :

Forecast Horizon: 24 P (Months)

History Horizon: 36 P (Months)

 

According to the Planning Area Settings, for Forecast KF-Negative values are not allowed.

 

For few codes when I tried to generate forecast interactively its giving an error message:

“Negative values are not allowed for the forecast key figure”

 

While for other codes even if they have a decline trend, system is not generating negative values instead populating zeros.

 

Note:

There are 4 weeks in past for which History is not available. But these weeks do not fall into the History Horizon of 36 P.

 

Analysis


I performed no. of tests and found different results:

 

  1. 1. When I deleted all the values prior to those 4 missing weeks, system is generating the forecast Properly.

Message:  Automatic Procedure 2 called

                 Seasonal test negative

                 Trend Test Positive

                 Constant model selected.

 

  1. 2. When I randomly put some approximate values in those 4 missing weeks again system is generating the Forecast properly.

Message:  Automatic Procedure 2 called

                 Seasonal test negative

                 Trend Test Positive

                 Trend model selected.

 

  1. 3. When I reduces the history horizon from 36 P to 35 P, system is generating the Forecast.

Message:  Automatic Procedure 2 called

                 Seasonal test negative

                 Trend Test Positive

                 Constant model selected.

 

Q1. Why the system is generating negative values for few codes while populating zeros for others ?

Q2. Why those 4 weeks are impactig the forecast, even when they are outside the History Horizon ?

Q3. Why constant model is selected in some cases even if “Trend test” is positive ?



Please let me know if you need any further information. TIA.

           

Regards

Lalit